In five phases, the right lane of westbound Belt Line Road may be closed to traffic from 9 a.m.-3:30 p.m. at various locations between US 75 and Coit Road as sidewalk replacement takes place. The work is expected to wrap up by late April.  

The phases/locations are as follows: 

  • Phase One: Between US 75 and Lindale Lane 
  • Phase Two: Between Lindale Lane and Weatherred Drive 
  • Phase 3: Between Weatherred Drive and Shadywood Place 
  • Phase 4: Between Shadywood Place and Mimosa Drive 
  • Phase 5: Between Mimosa Drive and Coit Road