In five phases, the right lane of westbound Belt Line Road may be closed to traffic from 9 a.m.-3:30 p.m. at various locations between US 75 and Coit Road as sidewalk replacement takes place. The work is expected to wrap up by late April.
The phases/locations are as follows:
- Phase One: Between US 75 and Lindale Lane
- Phase Two: Between Lindale Lane and Weatherred Drive
- Phase 3: Between Weatherred Drive and Shadywood Place
- Phase 4: Between Shadywood Place and Mimosa Drive
- Phase 5: Between Mimosa Drive and Coit Road