The right lane of eastbound Campbell Road between Gateway Boulevard and US 75 may be closed to traffic from 9 a.m.-3:30 p.m. for sidewalk repair needed as a result of gas line repair. The work is expected to be complete by mid-August.
The right lane of eastbound Campbell Road between Gateway Boulevard and US 75 may be closed to traffic from 9 a.m.-3:30 p.m. for sidewalk repair needed as a result of gas line repair. The work is expected to be complete by mid-August.