All lanes of Synergy Park Boulevard will be closed at the Silver Line railroad tracks from Thursday, Aug. 24 at 10 p.m. to Friday, Aug. 25 at 6:30 a.m. The closure is necessary so concrete can be poured for the Silver Line railroad bridge. Detour signs will be in place, but motorists are advised to avoid the area if possible.