In two phases, the right and left lanes of Main Street (Belt Line Road) between Grove Road and Walton Street may be closed to traffic alternately one lane at a time, at all times, as pavement repair takes place. Note that a two-lane closure and flagging operation is possible from 9 a.m.-3:30 p.m., but at least one lane will remain closed overnight. The work is expected to be completed by early July.
Lane Closures Expected on Main Street