The right turn lane of northbound US 75 frontage road onto Lakeside Boulevard may be closed to traffic from 9 a.m.-3:30 p.m. and detoured to eastbound Lookout Drive, southbound Performance Drive and finally to Waterwood Drive as a waterline installation takes place. The work is expected to be complete, weather permitting, by late January.
Richardson Projects: www.cor.net/projects.