Three President George Bush Turnpike and US 75 direct-connector ramps will be closed nightly from 9:30 p.m.-12:30 a.m. the evening of Nov. 13 to the morning of Nov. 15. The closed ramps include southbound US 75 to westbound PGBT, eastbound PGBT to southbound US 75, and northbound US 75 to eastbound PGBT. The closures are necessary so the North Texas Tollway Authority can conduct road maintenance.

  • Drivers traveling south on US 75 who are looking to get onto the westbound PGBT will take the Campbell Road exit ramp, where they will make a U-turn and enter northbound US 75. Motorists will enter westbound PGBT from the northbound US 75 to PGBT direct-connector ramp.
  • Drivers looking to exit onto southbound US 75 from the eastbound PGBT should exit at Alma Road and turn right before making a left onto Renner Road and continuing to US 75.
  • Drivers traveling north on US 75 who wish to exit onto eastbound PGBT will take the Plano Parkway/15th Street exit and make a right on State Highway 190 (PGBT frontage road). Drivers can enter eastbound PGBT from the Plano Road entrance ramp.

The closures are subject to weather conditions and will be postponed, if necessary.

For more information about upcoming lane closures and traffic-related news along NTTA roadways, go to the “Scheduled Lane Closures” listing at www.ntta.org.