The left-turn lanes on eastbound Arapaho Road to northbound US 75 frontage road have been reduced to a single lane, and the right lane of westbound Arapaho Road between North Greenville Avenue and US 75 is temporarily closed, as both stormwater and sanitary sewer repairs have begun in the area. The work includes repairing approximately 100 feet of 30-inch-wide concrete storm sewer pipe and relocating an 8-inch-wide sanitary sewer line. The work is expected to be completed by early August, weather permitting.